Tenant-uploaded photography only. Hard-coded sample photos are not used here.
Commercial roofs fail at seams, drains, and neglected penetrations. We inspect, document, and propose TPO, PVC, modified bitumen, or metal based on the deck, occupancy, and how the building is used. Night or phased work is available when the tenant cannot close. Pricing follows the measured field, insulation, edge metal, and access — not a per-square guess from the street.
Problems it solves
- Ponding and failed seams
- Leak callbacks from tenants
- Aging built-up or cap sheet
- Need for a cert before a sale or refinance
Properties
- Retail and office
- Warehouses and shops
- Medical and light industrial
Materials and systems
- TPO
- PVC
- Torch-down / modified
- Standing seam where specified
How we install
- Core and drain survey
- Written assembly
- After-hours plan if needed
- Install, flood test where specified, closeout packet
What affects price
- Squares and insulation
- Number of penetrations
- Edge metal and copings
- Access, lift, and after-hours labor
We do not publish a menu of exact prices. Cost depends on measure, materials, conditions, complexity, and final scope.
Benefits
- Documented assembly for the owner
- Manufacturer system path when specified
- Coordination with property managers
Limits
- Structural redesign and MEP moves are outside a reroof scope unless contracted separately.
Questions
Can you work while the business stays open?
Often yes. We plan access, fall protection, and noisy work around your hours.
Do you issue a roof certification?
We can inspect and issue a written condition report. A cert is based on what we can see and test — not a guarantee of hidden conditions.
